Lower level of the Meetinghouse Framing in the lower level of the Meetinghouse Old Town Hall interior being prepped for raising the floor Old Town Hall with framing in place to raise the floor. West side addition of the Old Town Hall gutted. New rear entrance vestibule Cleaned and expanded retention pond Site work